| No |
Product |
CLIENT |
PROJECT |
Scope of Work & Product Specification Related
( PLEASE Add the details ) |
Year |
| 1 |
CONTROL PANELS/STATIONS MAINTENANCE |
Takreer |
Ruwais Refinary |
Upgrading of Obsolete ACB + Contactor |
2008 |
| 2 |
CONTROL PANELS/STATIONS MAINTENANCE |
ZADCO |
Arzanah Isaland |
Oil Replacement of 3 Transformer |
2008 |
| 3 |
CONTROL PANELS/STATIONS MAINTENANCE |
Takreer |
Unn Al Nahr |
Synchronizing Facilities 3.3KV SWBD. |
2008 |
| 4 |
CONTROL PANELS/STATIONS MAINTENANCE |
Takreer |
Ruwais Refinary |
Relay Replacement |
2008 |
| 5 |
CONTROL PANELS/STATIONS MAINTENANCE |
ZADCO |
Umm Al Dalk Facilities Project. |
Installation 3 nos. of 150KWDrawer |
2008 |
| 6 |
CONTROL PANELS/STATIONS MAINTENANCE |
ZADCO |
Umm Al Dalk Facilities Project. |
Supply Drawer Chassis |
2008 |
| 7 |
CONTROL PANELS/STATIONS MAINTENANCE |
ZADCO |
Cable Tray ZIRKU Island |
Supply Installation Cable Tray |
2008 |
| 8 |
Electrical, Pipings & Engineerings |
GASCO |
HABSHAN, UAE |
Diversion os 27 unit Condensate Detailed Engineering |
2007 |
| 9 |
Electrical, Pipings & Engineerings |
GASCO |
BU HASA Flares Upgrade |
EPC for the Replacement of the Tips for 4 Flares & New Ignition System. Flare 1 |
2007 |
| 10 |
Electrical, Pipings & Engineerings |
GASCO |
HABSHAN, UAE |
Installation Pipe Line |
2007 |
| 11 |
High Voltage Switchgear & transformer Installation |
GASCO |
BU HASA Flares Upgrade |
EPC for the Replacement of the Tips for 4 Flares & New Ignition System. Flare 2 |
2007 |
| 12 |
High Voltage Switchgear & transformer Installation |
ZADCO |
Transformer
Replacement
(22kV / 0.4kV) |
Supply, Installation, testing and commissioning of 1 Transformer, 1600 Kva 22Kv/0.4 Kv |
2007 |
| 13 |
High Voltage Switchgear & transformer Installation |
ZADCO |
Transformer Replacement (Export Gas Compressor) |
Supply, Installation, testing and commissioning of 1 Transformer, 8 Mva 22Kv/6.6 Kv |
2007 |
| 14 |
High Voltage Switchgear & transformer Installation |
GASCO |
Taweelah 11kV s/s |
Supply, Installation, testing and commissioning of 2 Transformer, 250 Kva 11Kv/0.44 Kv |
2007 |
| 15 |
High Voltage Switchgear & transformer Installation |
ORC - OMAN |
REVAMP PROJECT |
Supervision of 35" 6.6kV Switchgear Commissioing |
2007 |
| 16 |
High Voltage Switchgear & transformer Installation |
ADMA-OPCO |
MCC Retroffiting |
Supply Installation, Testing Commissioning |
2007 |
| 17 |
BATTERIES/BATTERY CHARGERS / U.P.S. |
ADMA-OPCO |
UPS Load Segregation |
Supply, Installation |
2007 |
| 18 |
Low Voltage Switchgear & transformer Installation |
ZADCO |
LV Shutter |
Supply, Installation Low Voltage Shutter |
2006 |
| 19 |
Low Voltage Switchgear & transformer Installation |
TOTAL |
Modification of LV Switchgear and replacement of ACB’s |
Supply, Installation, testing and commissioning of air circuit breaker. |
2006 |
| 20 |
Low Voltage Switchgear & transformer Installation |
ADNOC |
Modification of LV Switchgear and replacement of ACB’s |
Supply, Installation, testing and commissioning of air circuit breaker. |
2006 |
| 21 |
High Voltage Switchgear & transformer Installation |
ZADCO |
3.3KV Switchgear protective relays Upgrade |
Replacement of protection relays |
2006 |
| 22 |
Low Voltage Switchgear & transformer Installation |
ZADCO |
ACPT |
½ Switchgear Essential |
2006 |
| 23 |
High Voltage Switchgear & transformer Installation |
ZADCO |
CPC/LQP |
Refurbishment of No: 1600 KVA, 3.3 KV Transformers |
2005 |
| 24 |
High Voltage Switchgear & transformer Installation |
NPCC |
Satah Field Upgrading. |
Modification of 22 KV Switchgear for Satah Gas Compressor. |
2004/2005 |
| 25 |
High Voltage Switchgear & transformer Installation |
ZADCO |
Umm Al Dalk Facilities Project. |
3.3 KV Bus Bars Upgrade |
2004/2005 |
| 26 |
Low Voltage Switchgear & transformer Installation |
ADMA-OPCO |
Fire Water Pumps P-180 A/B. |
Supply, Installation and Commissioning of the New Control Panel. |
2004/2005 |
| 27 |
High Voltage Switchgear & transformer Installation |
TAKREER |
ADRD 2005 S/S11 Upgrade |
11 KV Circuit Breakers and Protection Relays Retrofit |
2004/2005 |
| 28 |
Low Voltage Switchgear & transformer Installation |
ZADCO |
Zakum Field Upgrading. |
Modification of 415V MCC Module Drawers. |
2004 |
| 29 |
High Voltage Switchgear & transformer Installation & Low Voltage Switchgear & transformer Installation |
AFI SITNA / GIAT INDUSTRIES |
QATAR Arm Force-Renovation of Power Pack Test Cells. |
Electrical, Mechanical And Instrumentation Contracting Works |
2003 |
| 30 |
BATTERIES/BATTERY CHARGERS / U.P.S. |
TECHNIP |
BP ARCO Al Rayan Development Oil Project. |
Supply, Installation And Commissioning Of Fire & Gas System. |
2002 |
| 31 |
High Voltage Switchgear & transformer Installation |
ADNOC |
Ruwais Housing Complex Project |
Supply, Installation And Commissioning Of Ring Main Units Sub-Stations. Supply Of Power And Instrument Cables. |
2001 |
| 32 |
High Voltage Switchgear & transformer Installation |
ADCO |
11 kV Switchgears Modification and Extension |
Supply Of Switchgear And Electrical Works Including Installation Of Power Cables And Modification Of Switchgear To Upgrade H.V. Motor Protection. |
2000 |
| 33 |
BATTERIES/BATTERY CHARGERS / U.P.S. |
TECHNIP |
ADMA-OPCO Zakum Gas Injection Project |
Supply, Installation and Commissioning of Instrument Hook-up Materials. |
2000 |
| 34 |
High Voltage Switchgear & transformer Installation |
VECO ENGINEERING |
ZADCO Zirku Production Facilities Effluent Water Disposal System Project 7170. |
Proj.7170 Supply, Installation and Commissioning of H.V. Switchgears and Power Transformers. |
2000 |
| 35 |
High Voltage Switchgear & transformer Installation |
QUANTELVECO ENGINEERING |
ADNOC Umm Al Nar Refinery Effluent System Upgrade Project. |
Supply, Installation and Commissioning of Power Transformers and MCC. |
1999/2000 |
| 36 |
Low Voltage Switchgear & transformer Installation&3 |
ADNOC OGDII |
TECHNIP / BECHTEL |
Supply of pipe, Bulk Piping & Structure Steel, Drums & Vessels, Laboratory Equipment, L.V.equipment, L.V.Cables and Air Cooler. Elictromecanical Works-Subcontractors |
1999/2000 |
| 37 |
BATTERIES/BATTERY CHARGERS / U.P.S. |
NIOC |
IRAN |
Y2K Compliance-SALMAN Complex |
1999 |
| 38 |
High Voltage Switchgear & transformer Installation |
ZADCO |
ZIRKU Project. |
Replacement of H.V. Motor Protection Relays. |
1999 |
| 39 |
Low Voltage Switchgear & transformer Installation |
ZADCO |
Insulation Monitoring ACPT. |
Supply, Installation and Commissioning of Insulation Monitoring System in replacement of Protective Relays. |
1998 |
| 40 |
High Voltage Switchgear & transformer Installation |
ADCO |
H.V. Switchgear Extension. |
Supply, Installation and Commissioning of H.V. Switchgear. |
1996 |